top of page
Albert Group

Performing Arts Center and Middle School Classroom: Proposal: Curtis School

15871 Mulholland Drive, Los Angeles, CA, USA

  • A proposal for a performing arts center consisting of a 480 seat proscenium theater with fly loft, music and dance studies, and supporting classrooms.

  • Teaming with John Sergio Fisher.

Area (SF)
Height (ft)
Construction type
Project delivery method
# units
Local zoning
Total parking
N/A
N/A
RE15-1-H
Design start
Entitlement obtained
Building permit obtained
Construction start
Certificate of Occupancy
N/A
N/A

Current status:

Proposal only

Anchor 1
Albert Group Architects
1745 Berkeley St. Studio 4
Santa Monica, CA 90404
(310) 820-8863
info@albertgroup.la
  • LinkedIn
  • Instagram
All images, drawings, renderings, pictures, videos and other electronic media on this website are the property of Albert Group Architects. Unauthorized use, reproduction, or dissemination of this media is strictly prohibited. All media and information on this site of projects are for general marketing purposes only and should not be relied upon for leasing, sales, construction, permitting, or any other purposes. 
bottom of page